Projetc: Construction of water supply systems for 9 towns of Binh Dinh Province
 
Detail:

Water and Environment Joint Stock Company (WACO) on April 17, 2006 was awarded 3 tender packages on engineering, procurement and construction of water supply systems for the towns of Bong Son, Tam Quan (Tender Package No. BD1), Dap Da, Go Gang, Ngo May (Tender Package No. BD3), Tuy Phuoc and Binh Dinh (Tender Package No. BD4) under the Project of Water Supply for Nine Towns of Binh Dinh Province, with total contract value of VND65.4 billion. Implementation period for each town’s water supply system ranged from 66 to 74 weeks from the start date in 2006. Main construction items included clusters of drilled wells, water treatment stations (with an average capacity of 4,000 m3/day), treated water reservoirs, control systems, and distribution pipelines with a total length of around 150 km.

This is a turnkey project (engineering, procurement and construction) funded by the Development Credit Agreement between the Socialist Republic of Vietnam and the International Development Association on the loan No. 4028-VN at the World Bank (WB).

 
NEXT PROJECT TITLES
Construction Of Kenh Dong Water Treatment Plant At 200,000 M3/day
Construction Of Sa Dec Groundwater Treatment Plant At 4,500 M3/day
Improvement Of Phan Rang Water Treatment Plant
Improvement Of Tertiary Technical Infrastructure Of Area 3, An Cu Ward, Ninh Kieu District, Can Tho City
Improvement Of Tertiary Technical Infrastructure Of An Hoi Ward, Ninh Kieu District, Can Tho City
Construction Of Phase 1 Nga Bay Phung Hiep Water Treatment Plant Of 5,000m3/day
Construction Of Huu Dinh Water Treatment Plant, Ben Tre Province
Construction Of Dieu Tri Water Treatment Plant
Improvement Of Cai Dau Water Supply System In Chau Phu District, An Giang Province
Supply Of Equipment To Go Den Urban Area Water Supply System Of 3,000 M3/day In Long An Province
Construction Of Tra Noc Water Treatment Plant
Construction Of Di An Water Treatment Plant Of 15,000 M3/day
Construction Of Binh Duc Water Treatment Plant Of 30,000 M3/day
Supply And Installation Of Equipment For Long Binh Water Treatment Plant, Bien Hoa IP 2, Dong Nai Province
 
Home | About | News | Projects | Services | Equipment | Investor relations | Customers
Subsidiaries | Careers | FAQ | Contact
Copyright © 2012 WACO. All rights reserved